Track revisions — current revision shown first, superseded revisions kept for record
Drawing No.
Title
Rev
Direction
Date
Link / File
Status
Actions
Other Documents
Contracts, specs, correspondence, photos — anything not a drawing
Name
Category
Date Added
Link / File
Added By
Actions
Inspection & Test Plan (ITP)
Stage-based quality checkpoints — sign off as each is completed
Completed Test Sheets
Automatically logged when a test sheet is saved for this project
Non-Conformance Register (NCR)
Log issues found during inspection, track to close-out
Ref
Description
Raised By
Date Raised
Status
Closed Date
Actions
Project Logbook
Chronological record of key events — some entries are added automatically
Handover Checklist
Status updates automatically where possible — tick off the rest manually
Handover Pack
Once everything above is green, generate the compiled handover document
Invoices
Invoice No.
Project
Client
Type
Date
Due
Total
Status
Actions
Create Invoice
Schedule of Works
Description
Qty
Rate (£)
VAT
Amount
Chasing Log
Live Preview
Finance
Monthly Revenue vs Costs
Based on invoices raised (ex-VAT). Costs from monthly expenses below.
RevenueCostsP&L
Monthly Expenses
Enter actual costs per category for each month — used in Profit/Loss above.
Month
Revenue (ex-VAT)
Costs
Profit / Loss
Invoices
Test Sheets
🔧
Pipework Test
EN12845
🔵
Pressure Test
Certificate
🏗️
Dry Riser
BS 9990:2015
🚒
Fire Hydrant
BS 9990:2015
🏠
Commission Sheet
Residential
Project Details
Test Results
Location
Description
Duration
Flow (L/min)
Pressure (bar)
Comments
Declaration
On behalf of Apex Fire Sprinklers, I confirm that the information provided in this document is deemed honest and accurate.
Project Details
Pre-Test Checks
Method Statement & Risk Assessment read and understood
Snagging Complete
Visual Inspection of Installation
Compressor / water pump and hoses fit for purpose (PAT test etc.)
Type of Test
Test Results
Area / Location
Working Pressure (bar)
Test Duration
Test Pressure (bar)
Sign Off
Project Details
This is to certify that the dry riser has been tested in accordance with BS 9990:2015 by Apex Fire Sprinklers Limited.
Test Results
Location
Formal/Visual
Pressure (bar)
Time Held
Pass/Fail
Tech Initials
Witnessed By
Comments
Disclaimer & Sign Off
Please note that whilst every care is taken in the testing of dry risers, situations can arise which may lead to a leakage of water. Before commencing testing Apex Fire Sprinklers Limited will visually check for any defects however there may be faults not determinable by visual inspection. Apex cannot be held responsible for any damage or consequential loss resulting from a leaking/faulty dry riser system and the client accepts that no claims can be made against the servicing company.
Project Details
This certificate confirms that the fire hydrant specified below has been subjected to inspection, service and flow testing in full compliance with BS 9990:2015, as carried out by Apex Fire Sprinklers Limited.
Hydrant Checklist
Static Pressure & Flow Test
Sign Off
Project Details
Residential Sprinkler Commissioning Sheet
Plot Commissioning Records
Plot/Floor
Address
No. Heads
Head Type
Test Equip.
Required Demand
Result
Pass/Fail
Alarms Sounded
Water Live
Power Live
Covers Fitted
Valves Open
Commissioned By
Date
Notes
Sign Off
New Client
Import Projects & Invoices
This will import your existing data:
✓ 18 projects extracted from your invoices ✓ 23 invoices with paid/outstanding status
Won't duplicate data already in the app. Edit project details after importing.